This note is to back up our telephone conversation (2/5/67) in which I requested you to prepare our recommendation as to how the AGC should be used during the simulated translunar injection maneuver on AS-503. It’s certain the crew will want to monitor the progress of this large SIVB maneuver, even though it’s controlled by…
Category: Burn monitoring
Immediate restart of the SPS engine under PGNCS control
This memo is in response to your question as to whether there was anything in the spacecraft computer that would prevent attempting to restart the SPS engine immediately if it shut down prematurely for some reason. I passed this question on to the Guidance and Performance Branch (MPAD). The following paragraphs are quoted almost verbatim…
C’ Mission Techniques
Attached are a list of ground rules and working agreements I compiled from my notes taken at the September 13 and 14 Mission Techniques meetings and the September 20 Lunar Abort meeting, all on the C’ mission. This list is far from complete. Basically, these items are only the changes and additions to the material…
Descent Orbit Insertion (DOI) monitoring and abort procedures are proposed
Something rather interesting came out of Floyd Bennett’s April ?? Descent Mission Techniques meeting that I would like to pass around. It has to do with monitoring the DOI maneuver….
D Rendezvous Mission Techniques
The final review of the D Rendezvous Mission Techniques will be held on Wednesday, January 15, starting at 9:00 a.m., in Room 383, Building 4….
Descent monitoring at MCC
We have reached a plateau in our work on Descent Monitoring, perhaps making it worthwhile to send out this memo. First of all, I don’t think there is any question that Descent is the thing that requires most of our attention between now and the G mission, at least in the empire of Mission Techniques….
Crew monitoring of the LOI maneuver
On August 3 we had an informal meeting to talk about crew monitoring of the Lunar Orbit Insertion (LOI) maneuver. The subject came up in connection with Jim McDivitt’s preparation for the STAC presentation. I’m writing this note because we tentatively agreed on some fairly basic points with regard to how we might use the…
Recommendation to retain the Two-Stage Lunar Orbit Insertion (LOI) Maneuver
This memorandum documents the results of our review of the two-stage LOI maneuver which you requested as a result of a recent OMSF suggestion that it might be preferable to return to a single burn plan. Participation in this review involved all operational elements of MSC concerned in this matter. The conclusions are unanimous….
C’ Abort Maneuver Overburn Monitoring
In response to a C’ Mission Techniques action item, Rick Nobles informs me that they have established the burn monitoring procedure to guard against overburn during any non-nominal C’ maneuver. As a standard procedure the crew should manually shut down the SPS as soon as the duration of the burn exceeds the nominal value by…
C’ Earth Orbit and TLI Mission Techniques Open Items
It appears we have the Earth Orbit and TLI Mission Techniques for the C’ pretty well under control. The only two significant open items that I know of deal with the optics check and the crew procedures for protecting against an SIVB engine cutoff failure during TLI….