FS/Chief, Flight Support DivisionOCT 26 196767-FM-T-97FM/Deputy ChiefCore rope simulator certification
As you know, Jack Williams is attempting to trace down and verify the validity of the logic which led to the decision to exclusively utilize core rope simulators for all spacecraft computer program verification. Since I anticipate we may never really reach a satisfactory conclusion to this investigation, it might be appropriate to have a document on the order of that attached signed by the appropriate representatives of the G&C Division and MIT, who should be responsible for certifying that the PAC is really okay. Perhaps representatives of other organizations such as Raytheon and AC Electronics should also be included.
- Jul 31, 1967 – We’re gonna’ find out if the PAC is a good substitute for the flight ropes (5.4σ)
- Oct 19, 1967 – K-start tape briefing (3.9σ)
- Feb 07, 1968 – Terminal phase transfer angle may be changed to 130° (3.6σ)
- Aug 08, 1967 – Do y’all need the MIT hybrid facilities for crew training? (3.1σ)