FM2/Flight Software Branch Attention: R. O. NoblesJAN 9 196767-FM1-2FM/Deputy Chief, Mission Planning and Analysis DivisionProcedures needed for the AS-503 TLI maneuver
This note is to back up our telephone conversation (2/5/67) in which I requested you to prepare our recommendation as to how the AGC should be used during the simulated translunar injection maneuver on AS-503. It's certain the crew will want to monitor the progress of this large SIVB maneuver, even though it's controlled by the Saturn guidance sytsem. You were to find out what capabilities exist in the AS-205/503 program for use during this mission phase. For example, one possible solution is for the crew to observe a of display velocity, altitude and altitude rate if this launch phase processor is function at that time.
- Apr 03, 1967 – LM S-band antenna boresight change presents no LGC problem (3.6σ)