See list belowDecember 2, 196868-PA-T-263APA/Chief, Apollo Data Priority CoordinationProposal to add something nice to the F mission
If it makes sense, I would like to start a campaign to add some actual powered descent into the F mission with an abort about 300 seconds after PDI or whenever it is that the DPS can return the LM to the desired orbit. Could you people please give me a list of the benefits we can obtain by doing this, such as:
a. Realistic full duration DPS test
b. Landing radar tests
c. Powered flight MSFN data to test the Lear processor
d. PGNCS guidance test
e. Shortening the rendezvous two hours
You might also identify hazards. If the results of this survey are positive, I will put together a proposal and try it out on our leaders.