See list attachedOctober 18, 196868-PA-T-228APA/Chief, Apollo Data Priority CoordinationC’ Contingency Procedures – Draft Review
A review of the C' Contingency Procedures Techniques Document is currently scheduled for October 22, 1968. Topics included are:
◦ TLI + 10 and TLI + 90 minute aborts
◦ Translunar Coast Aborts – Block data
◦ LOI and TEI Mode I and Mode II aborts
The burn monitor procedures are included in other techniques documents, but will be summarized in the contingency techniques to provide a com- prehensive document.
Draft copies of the document will be provided at the review which starts at 9:00 a.m. in Room 396 of Building 4.
- Sep 25, 1968 – Review of the Mission Techniques for Saturn V/Apollo Launch Phase Aborts (4.7σ)
- Feb 26, 1969 – Review of the Launch Phase Abort Mission Techniques Document for Missions F and G (4.2σ)
- Jul 26, 1968 – Mission Techniques Documentation Schedule (3.1σ)
- Dec 18, 1967 – Third Trajectory Control Data Priority Meeting for Spacecraft 101 (3.1σ)
- Feb 25, 1969 – Mission D Maneuver Monitoring Document (3.5σ)